Consider an example of a 1290 sq feet apartment at 6th floor in Construction Linked Plan.  In first scenario the cost of apartment is worked out at rates prevailing in May 2013. In second scenario is based on rates prevailing in Aug 2013.
(IFMS, Dual Meter and Club Membership Charges being common in both scenarios, are omitted.)

SCENARIO 1        COST  AS  PER  RATES  DURING   -    MAY  2013
CHARGES  HEADS
RATE
(` PER SQ FT)
AREA
COST (`)
BSP PER SQ FT
3010
1290
3882900
ADDITIONAL  PER SQ FT CHARGES = FFC + EEC + IDC +EDC + PARK/ROAD FACING CHARGES = 25 + 40 + 25 + 50 + 27.5
167.5
1290
216075
POWER BACKUP
20000
 
20000
COVERED PARKING
200000
 
200000
TOTAL
4318975


 SCENARIO 2    COST  AS  PER  RATES  DURING   - END JUL  2013
CHARGE HEADS
COST (`)
CONSOLIDATED PRICE
4090000
ADDITIONAL  PER SQ FT CHARGES = FFC + EEC + IDC +EDC + PARK/ROAD FACING CHARGES = 0 + 0 + 0 + 0 + 0
0
POWER BACKUP
0
COVERED PARKING
0
TOTAL
4090000

COST COMPARISON OF SAME APARTMENT  IN BOTH SCENARIOS
COST OF APARTMENT IN MAY 2013
4318975
COST OF APARTMENT IN END JUL  2013
4090000
DEPRECIATION IN THIS PERIOD
228975
% DEPRECIATION IN THIS PERIOD
5.30%

You are requested to analyse and comment.

2 comments:

  1. Hi, Please re validate PLC, IFMS, EEC, FFC, EDC & IDC charges. this should be Rs.120 sq/ft not Rs.167.5 sq/ft. I've analyse with my cost estimation. May month Cost = 3882900 + 154800 ( 120 * 1290) + 15000 ( power back up 1 kv) + 1,50,000 covered parking = Rs.42,027,00 and July 2013 cost = Rs.40,90,000 + 25,800 ( 1290 *20 IFMS) + 15,000 ( Power backup 1 KV) = Rs. 41,30,800. Cost reduction = Rs. 71,900 i.e; 1.7108% reduction. Please correct me if I'm wrong

    ReplyDelete
  2. Dear Harish, See the charges applicable in May end / June. I've taken the charges from the Official Site of Bharat City. Only change is that I have taken the average charges of park / road facing. I myself would be very happy to be corrected, if I erred or missed some calculation. After all I too have put my hard earned money for the apartment. But my calculations do not make me feel happy. By the way the charges are, FFC + EEC + IDC +EDC + PARK/ROAD FACING CHARGES = 25 + 40 + 25 + 50 + 27.5 respectively and the covered parking is for 200000 and not 150000 as calculated by you. Probably you have calculated as per the rates applicable in begining of May 2013. I have calculated at the rates as found on 22 May on Bharat City official website. I have downloaded a pdf copy of all the rates as posted on Bharat City official website since launch of the project.

    ReplyDelete